Search In this Thesis
   Search In this Thesis  
العنوان
RISK ANALYSIS OF CONSTRUCTION SECTOR IN EGYPT(DURING THE ECONOMIC RECESSION PERIODS) /
المؤلف
ELMatbaegy, Shahenda Ali.
هيئة الاعداد
باحث / شاهندة علي رمضان المطبعجي
مشرف / محمد محمد الغندور
مشرف / طارق عبد المنعم شرف
مشرف / معتز خليل عبد الفتاح
مناقش / محمد أحمد محمدين
مناقش / حسن محمد حسن
الموضوع
Recession Egyptian construction sector Risk model Mitigation measures framework project lifecycle
تاريخ النشر
2017
عدد الصفحات
1v.(various paging) :
اللغة
الإنجليزية
الدرجة
ماجستير
التخصص
الهندسة المدنية والإنشائية
تاريخ الإجازة
27/9/2017
مكان الإجازة
جامعة بورسعيد - كلية الهندسة ببورسعيد - الهندسة المدنية
الفهرس
Only 14 pages are availabe for public view

from 228

from 228

Abstract

The construction sector is considered one of the economic pillars in Egypt, where it holds
4.8% of G􀀘P (issued by the General Authority for Investment and Free Zones). The
construction sector accounts for 11 percent of total employment in 201􀁁/201􀁂 with a
workforce of 2.7 million people (Egyptian center for economic studies). It is recognized
that there is a strong linkage between the Egyptian construction sector and the other
sectors. The cyclical fluctuations in growth rates and the relative share of the construction
sector—almost every five years—point to the highly sensitive nature of this industry to
economic cycles. It is seen in 201􀁂 a high inflation which is the biggest since the global
recession in 2008. As perceived the economy witnessed a recession which is considered the
worst due to inflation. For this reason, this study aims to assay the risks of 􀀗onstruction
sector and its mitigation measures in accordance with the economic recession as a variable.
Risks were collected through literature review and were defined according to the variable
of the study. In addition, the questionnaires have been reviewed, according to expert
opinions. Respondents were comprised two categories the owner or his representative the
consultant and contractor to find out the opinions of all respondents and determine the
responsibilities of risks by using quantitative analysis with the SPSS program aid in
accordance with the economic objective and assay critical risks. Then critical risks were
analyzed by Primavera risk analysis software to determine the top critical economic risks
during the project life cycle, according to the economic objective of the project as well.
Recommendations showed the government’s role in the development of the sector and the
issuance of suitable legislation as a comprehensive solution to the period. In addition, the
study created a checklist involved the suggested risk management framework to help
project managers proceeding their projects in the desired level of cost and time.