![]() | Only 14 pages are availabe for public view |
Abstract in Alexandria, Malha District, where the results from validation indicated that the model is credible and can be used in estimating time, unit cost and average productivity for road construction operations. Based on simulation methodology using (EZStrobe) program and analytical data inputs using fractional factorial method accordingly, the productivity variation resulting from the simulation of different 27 scenarios in two methods can identify the benefits of advanced systems using GPS. |