Search In this Thesis
   Search In this Thesis  
العنوان
Stable Schedules For Resource-Constrained Projects Under Uncertainty/
الناشر
Raafat H. Elshaer,
المؤلف
H Elshaer, Raafat .
الموضوع
Industrial Engineering.
تاريخ النشر
2009 .
عدد الصفحات
211 p.:
الفهرس
Only 14 pages are availabe for public view

from 247

from 247

Abstract

In Ipractice A baelie Schedule For Resource -Constrained Project May Suffer from Several Types Disruption And A Reactive Scheduling Is Considered The Main Method For Re- Optimizing The Schedule This Method Does Not Guarantee Project Stability As It Usually Does Not Lead To Optimum Solutions Altermatively We Develop A rEACTIVE aLGORITHM fOR aLLOCATING rESOURCES tO The Activities Of The Baseline Schedule In order To Maximize Its Stability In The Presence Of Activity Duration Variability As A sOURCE oF dISRUPTION aS sHOWN iN cHAPER 3 Of This Dissertation Computational Results Obtained For A Sat Of Benchmark Problems Show That The Prepeosed Algorithm Performs Well Compared With Others In The Literature